Mount Microfilm

In order to prepare for our summer renovation, staff have been working to remove redundant material from the collection. After working on portions of the microfilm collection on Friday, here’s the resulting pile of discards.

Summer 2012 Updates

Welcome to the Boatwright Library Construction blog! This site will be frequently updated with news, updates, and photos to keep you informed of the changes happening to the building. Here are a few of the changes that will happening this summer:

  • Adding 7 group study rooms for a total of 14
  • Creating 8 individual study rooms
  • Remodeling the restrooms on the 1st, 2nd and B2 levels
  • Designating the 1st floor as collaborate space
  • Designating the 2nd floor as quiet space
  • Adding additional surface space on the 1st and 2nd floors
  • Increasing the number of power outlets for laptops and mobile devices
  • Research librarians and interlibrary loan staff will be more accessible

Visit often for updates!