June 13 Update

So much is going on at Boatwright!

Over the last week major work has began on the third floor (TLC area) and the stairs leading up to it. A window is being installed to look into and out of the TLC. Down on the first floor the lobby and area near the main service desk has received a new ceiling grid/tile system. The same ceiling upgrade will be performed on the main stairwell.

The new study rooms are taking shape on the second floor including the three very neat looking individual study rooms. Staff offices also continue to take shape up on the second floor.

Work continues on the first floor collaborative areas. The posts that will hold the media walls have been installed. Also, the rear of the main service desk has been reworked and will now be a room and not a pass through. The new hallway in from the back door is now almost complete.

More to come later!